Affichage de 11-20 sur 36 résultats
Publication en vente / 26 août 2024
2023 SCC Annual Report800,00 $ CAD
This report presents the results of the 55th consecutive survey of performance of Distribution Systems in electrical utilities. The report, prepared by Electricity Canada, presents a statistical summary of the Distribution Systems performance for the year 2023 and compares it to 2022, as well as to the 2019 - 2023 five-year average.
Publication en vente / 10 octobre 2023
2023 SCC Annual Report800,00 $ CAD
The report contains information on system reliability and performance. By using these metrics in combination with the cause of an electricity interruption, utility companies can set targets for improving service reliability, develop programs in support of their improvement targets, and make design/build decisions that try to mitigate interruption cause.
Publication en vente / 12 juin 2023
2021 G-ERIS annual report1 400,00 $ CAD
Publication en vente / 12 juin 2023
2021 Bulk Electricity System Annual Report800,00 $ CAD
Provides data on delivery point interruptions, described as the interface between the BES and the Distribution System. Use it to determine the quality and performance of utility service with respect to their transmission systems, by performing analysis on momentary and sustained outages on single, and multi circuits.
Publication en vente / 6 juin 2023
Transmission Component Forced Outages Equipment Reliability Information System1 400,00 $ CAD
This report on the performance of transmission equipment is based on data for the period January 1, 2017 to December 31, 2021. This report is published annually.
Publication en vente / 27 juillet 2022
2021 Distribution System Performance: A Service Continuity Annual Report – Digital Publication800,00 $ CAD
Contains information on system reliability and performance. By using these metrics in combination with the cause of an electricity interruption, utility companies can set targets for improving service reliability, develop programs in support of their improvement targets, and make design/build decisions that try to mitigate interruption causes.
Publication en vente / 31 décembre 2020
2020 Bulk Electricity System: Delivery Point Interruptions & Significant Power Interruptions – Digital Publication800,00 $ CAD
Provides data on delivery point interruptions, described as the interface between the BES and the Distribution System. Use it to determine the quality and performance of utility service with respect to their transmission systems, by performing analysis on momentary and sustained outages on single, and multi circuits.
Publication en vente / 31 décembre 2020
2020 Generation Equipment Status: Equipment Reliability Information System Annual Report – Digital Publication1 400,00 $ CAD
The information in this report can be used by utility companies to benchmark Generating Unit (GU) performance; make better-informed decisions regarding new GU construction and existing unit upgrades; improve resource focus for maintenance programs and system planning. The goal of using the information is to maximize Generating Unit performance within a company’s financial and logistical constraints. The report contains performance data for over 600 generating units in Canada. The statistics are broken out by hydro, thermal, combustion, nuclear, combined combustion and thermal combined cycle units and focus on unit availability and forced outage data, including mean forced outage duration, fail rate, and incapability factor metrics.
Publication en vente / 31 décembre 2020
2016-2020 Forced Outage Performance of Transmission Equipment: EQUIPMENT RELIABILITY INFORMATION SYSTEM – Digital Publication1 400,00 $ CAD
Publication en vente / 31 décembre 2020
2020 Distribution System Performance: A Service Continuity Annual Report – Digital Publication800,00 $ CAD
Contains information on system reliability and performance. By using these metrics in combination with the cause of an electricity interruption, utility companies can set targets for improving service reliability, develop programs in support of their improvement targets, and make design/build decisions that try to mitigate interruption causes.